News

Home > News

How to Recycle Construction Waste?(Mobile Crusher)

As we all know, if we don't take effective and immediate way to process more and more construction waste produced from demolition and city reconstruction, our limited resources including land and environment will be threatened, which will greatly influence city development.

Then a question comes up: how to process construction waste in an effective way? The traditional methods to process construction waste include backfilling, burying and exposure, which all fail to remove the root problem to some degree. In fact, there are a lot of materials contained in construction waste such as concrete, brick waste, steel slab, glass, batten and etc, which could be applied to making aggregates and gravel roads after being crushed appropriately.

mobile crusher

So what kind of crusher should be chosen to process construction waste? And I am here to recommend the 300t/h mobile crusher.

1. What Makes the Mobile Crusher So Hot?

a. Ideal Productivity (80-650t/h);

b. Smooth and flexible performance;

c. A wide range of application.

2. How Much Does a 300t/h Mobile Crusher Cost?

mobile crusher

As a professional mobile crusher manufacturer, Henen Fote is willing to offer you specific price list and specification on line.

prev: 4-5t/h Raymond Mill for Sale—Price and Specification

next: Cheap Chrome Beneficiation Plant for Sale